Archive for November, 2013

Shire of Beverley Trails Master Plan

Tuesday, November 26th, 2013

Transplan Pty Ltd has been appointed by the Shire of Beverley to prepare the new Trails Master Plan for the Shire. Four key areas have been identified by the Shire representatives: an in-town heritage trail; trail circuits along the Avon River (which runs through the town); trails at Avondale Farm ( which is located a few kilometres out of town); and a trail connection between the town of Beverley and Avondale Farm.