Tumbarumba to Rosewood Rail Trail Development Plan

Transplan Pty Ltd has submitted the draft of the trail development plan for the proposed rail trail between Tumbarumba and Rosewood. The 21km rail trail is one segment of the proposed future (130km) Wagga Wagga to Tumbarumba Rail Trail which Transplan and Mike Halliburton Associates prepared a feasibility study for in 2006. The Tumbarumba to Rosewood Rail Trail is being regarded as a ‘pilot’ or ‘demonstration’ rail trail project in NSW and could set the scene for the development of additional rail trails on government owned disused railways in NSW.

Tags:

Leave a Reply